Feiss SF296 User Manual

Sf296, Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE

OR CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts

before

assembly. Bulbs not included.

1. Follow enclosed supplement installation

instructions for electrical and fixture

installation onto house outlet box. If you

do not have an outlet box at desired

location to attach the fixture then hire a

qualified electrician to create one.

2. Install light bulb (not included). See

relamping label at socket area for type

and maximum allowed wattage.

3. Screw the long threaded pipe into coupler

located at bottom of socket assembly.

Note correct position of threaded pipe on

illustration.

4. Place the metal ring onto the glass. Then

slip the glass through the threaded pipe

until the metal ring securely checks into

the bottom of the arms. Then secure into

position by fastening the washer and the

knurled nut onto the bottom of the

threaded pipe.

5. Slip the metal frame up until it checks

into the bottom of the metal ring. Then

lock into position using the screws.

6. Install notched cover by fastening with

finial.

4

4

5

6

1

3

2

Assembly Instructions For

SF296

(E) 6/2012

Advertising