Feiss FM354 User Manual

Fm354, Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR

CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly.

Bulbs not included.

1. Install mounting plate:

A. Fasten two long machine screws (supplied) into

opposite side of the mounting plate from green

grounding screw head.

B. Take supply wires from outlet box and carefully pass

them through center hole of mounting plate.

C. Install mounting plate onto the outlet box using two

screws supplied with outlet box.

D. Test install fixture plate to make certain about 1/4”

(5mm) of screws thread protrude outside of fixture

plate. If not then remove fixture plate and adjust screws

length accordingly. Secure screws length by fastening

with two hex nuts. Make certain not to spin screws

during fastening. Place fixture plate aside.

E. Spread electrical wires so that black wires are on one

side of the outlet box and the white wires are on the

other side.

2. Connect electrical wires:

A. Connect white fixture wire to white supply wire

from outlet box with wire connector. Connect black

fixture wire to black supply wire from outlet box with

wire connector.

NOTE: Black outlet box wire may be red, round and

smooth and/or have copper conductor. White outlet

box wire may be square and ridged and/or have a silver

conductor.

B. Connect fixture ground wire (without plastic

insulation) to ground wire from outlet box (usually with

green insulation) with wire connector.

Note: If there is no supply ground wire at outlet box

then attach fixture ground wire securely onto green

grounding screw located at mounting plate.

IMPORTANT: Never connect ground wire to black or

white supply wires (from outlet box).

3. Install fixture plate. While carefully tucking all electrical

wires inside of fixture plate, install the fixture plate onto

the mounting plate by fastening with two cap nuts.

4. Install center pipe by screwing into bottom of socket

assembly. Note correct position of center pipe at

illustration.

5. Install bulb (not included). See relamping label located at

socket area for type and maximum allowed wattage.

6. A. Slide cup, open side facing down, and shade through

the threaded pipe until shade comes to a stop.

B. Secure shade into position by fastening with a

washer and a hex nut. IMPORTANT: DO NOT OVER

TIGHTEN.

C. Slip cover and secure by fastening finial.

Assembly Instructions For

FM354

(E) 5/10

6A

4

5

3

1

2

6B

6C

Advertising