Feiss F2397-5 User Manual

Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR

CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly. Bulb not

included.

1. Carefully thread fixture wire through fixture loop. Screw fixture

loop onto top threaded pipe until secure.

2. A. Spread open all arms so they are equally spaced apart to each

other.

B. Lock upper section of arms with ball cap screw onto

corresponding holes at center body.

3. Install bottom cover onto bottom of fixture by fastening with

finial.

4. Follow enclosed supplement installation instructions for electrical

and fixture installation onto house outlet box. If you do not have

an outlet box at desired location to attach the fixture than hire a

qualified electrician to create one.

5. Place Shade over threaded socket then spacer tube and secure

with counter ring, using provided wrench.

6. Install bulbs (not included). See relamping label located at socket

area for type and maximum allowed wattage.

Assembly Instructions For

F2397/5

Socket

Bulb

(not included)

Counter Ring

Arm

Shade

Fixture Loop

Ball Cap Screw

(E) 11/08

Wrench

(supplied)

Bottom

Cover

Finial

Spacer Tube

Fixture Wires

4

2

1

3

5

6

Advertising