Feiss F2045-3 User Manual

E) 9/05

Advertising
background image

(E) 9/05

ASSEMBLY I NSTRUCTI ONS FOR F2045/3

M U R R A Y F E I S S

©MURRAY FEI SS I MPORT LLC.

IMPORTANT

TURN OFF POWER AT MAIN FUSE OR

CIRCUIT BREAKER BOX BEFORE

STARTING INSTALLATION

Carefully unpack and identify all parts

before assembly. Bulbs are not included.

1. Install center body by screwing into center

column.

2. Screw threaded pipe into bottom of socket

assembly. Note correct position of threaded

pipe at illustration.

3. Install arms onto center body by fastening

with ball cap nuts.

NOTE: Extra ball cap nuts can be

found in a plastic pouch attached inside

of box.

4. Follow enclosed “Chain Suspended

Fixture Installation Instructions” for

electrical and fixture installation onto

ceiling outlet box.

5. Install bulbs (not included). See relamping

label located at socket area for type and

maximum allowed wattage.

6. Slip glass shade through threaded pipe until

it rests onto bottom section of arms. Lock

them into position by fastening with washer

and hex nut. Do not over tighten.

7. Slip cap and fasten finial onto threaded pipe.

Bulb

(not included)

Socket Assembly

Long Threaded Pipe

Glass Shade

Cap

Flat Washer
Hex Nut

Finial

Center Column

Arm

Center Body

Fixture Loop

Advertising