Feiss F2112-3 User Manual

E) 10/06

Advertising
background image

(E) 10/06

ASSEMBLY INSTRUCTIONS FOR F2112/3

IMPORTANT:

TURN OFF THE POWER AT THE MAIN

FUSE OR CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION.

Carefully unpack and identify all parts

before assembly. Bulbs are not included.
1.
Screw center pipe onto top of socket

assembly while removing any slack in

wires in between parts.
2. Install arms:

A. Install upper section of arms onto studs,

which are located at top section of center

pipe, by tightening set screw. Use enclosed

hex key to tighten.

B. Install lower section of arms onto pan

by fastening with machine screws.
3. Carefully thread fixture wire and ground

wire through fixture loop. Screw fixture

loop onto top threaded pipe until secure.
4. Install a hex nut onto one end of long

threaded pipe leaving about 1/2” (13 mm)

thread exposed. Screw same end of

threaded pipe into coupler. Tighten hex nut.
5. Follow enclosed “Chain Suspended

Fixture Installation Instructions” for

electrical and fixture installation onto

ceiling outlet box.
6. Slip glass shade up till it checks into

bottom of pan. Then lock into position by

fastening with flat washer and hex nut.

Do not over tighten.
7.

Install finial by fastening onto bottom of fixture.

8. Install light bulb (not included). See

label located at socket area for type and

maximum allowed wattage.
9. Install two glass plates onto top of socket

assembly by placing holes in plates

through four screw studs and securing

with four ball cap nuts. Do not over

tighten.

Fixture Loop

Center Pipe

Ball Cap Nuts
Rubber Washer
Glass Plate

Socket Assembly

Fixture Wire &

Ground Wire

Pan

Glass Shade

Flat Washer

Hex Nut
Long

Threaded

Pipe

Finial

Hex Nut

Hex Key

Arm

Machine Screw

Bulb

(not included)

Set Screw

3

2a

9

8

6

7

2b

1

5

4

Advertising