Feiss F1904-4 User Manual

E) 10/04

Advertising
background image

(E) 10/04

ASSEMBLY I NSTRUCTI ONS FOR F1904/4

M U R R A Y F E I S S

©MURRAY FEI SS I MPORT LLC.

Bulb

(not included)

Socket

Font

FIG: 1 CHAIN HUNG INSTALLATION

FIG: 2 FLUSH MOUNT

INSTALLATION

Mounting Plate

Machine Screws

Note: Spare crystals enclosed in hardware bag.

Fixture Wire

and Ground Wire

Fixture Loops

Threaded

Chain Link

Fixture Plate

Canopy Loop

Ball Cap

Nuts

Chain

Threaded

Chain Link

Candle Tube

Hex Nut

Lock Washer

Fixture plate

Short

Threaded

Pipe

Fixture Wire

& Ground Wire

Canopy Loop

Ball Cap Nut

IMPORTANT TURN OFF POWER AT MAIN FUSE OR

CIRCUIT BREAKER BOX BEFORE

STARTING INSTALLATION

Carefully unpack and identify all parts before assembly.

Bulbs are not included.

1. Place candle tubes over candelabra sockets and screw

bulbs (not included) into sockets to secure. See relamping

label on candle tube for type and maximum

allowed wattage.

2. Install font by screwing into bottom of fixture.
3. Hang all crystal glass parts as shown on drawing.

NOTE: To replace broken crystals or pins extras are

included in hardware bag. To replace broken crystals

open pins, remove crystal, hook new one, then close

back pin. Avoid bending pins into sharp angle.

4. This fixture can be mounted onto ceiling either as

chain hung or flush mount:

CHAIN HUNG INSTALLATION- Fig. 1:

A. Take fixture wire (with plastic insulation) and

ground wire and thread through fixture loop. Then

install loop onto threaded pipe located at top of fixture.

B. This fixture is supplied with 2 threaded chain links.

These links are opened and closed by twisting cylinder

on chain link. One threaded chain link should be

installed onto canopy loop and the other should be

installed onto fixture loop. The standard chain should

be installed in between these 2 threaded chain links.

C. Determine the desired length of chain to hang.

Remove any unwanted links with chain plier.

D. Take ground wire and weave through above chain

links, then thread through center hole in canopy loop.

Repeat with fixture wire (wire with plastic insulation).

FLUSH MOUNT INSTALLATION- Fig. 2:

A. Remove and discard canopy loop and threaded pipe

from fixture plate.

B. Thread ground wire and fixture wire through fixture

plate, lock washer, and hex nut. Lock all together on

top of fixture by tightening hex nut onto threaded pipe.

5. Cut excess wires leaving only 6" (15cm) length of

wires above canopy. Split fixture wire into two strands.

Then strip off 3/4" (19mm) of outer plastic insulation.

6. Follow enclosed “Multiple Standard Installation

Instructions” for electrical and fixture installation onto

ceiling outlet box.

NOTE: Before starting wire connection, enlist a helper to

support the fixture, or make a hook from a wire coat hanger

and temporarily suspend the fixture from mounting plate.

2

2

1

3

1

1

2

(8) PC.

1

(12) PC.

3

(1) PC.

Advertising