Feiss F2809-9 User Manual

Maarid 9 light chandelier, Installation instructions for, Gp i : eneral roduct nformation

Advertising
background image

1

Installation Instructions for

Maarid 9 Light Chandelier

1.0

F2809-9

CAUTION - RISK OF FIRE

This product requires installation by a qualified electrician.
Before installing be sure to read all instructions and
TURN THE POWER TO THE ELECTRICAL BOX OFF.

Chandelier

F2809-9_

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is suitable for dry locations only.

This product may be dimmed with a standard incandescent dimmer.

This instruction shows a typical installation.

1A

FINIAL SET

5

5

6

8

1

LAMP

FIXTURE BOTTOM

CANDLE FOLLOWER

CANDLE TUBE

FIXTURE TOP

FIXTURE LOOP

UPPER
NIPPLE

STEM

SPACER

8

7

STRING OF BEADS

MIDDLE NIPPLE

BOTTOM NIPPLE

FIXTURE BASE

4

3

2

7

6

1

2

3

Follow enclosed supplement installation instructions for electrical and fixture installation onto house outlet box.

Install the candle tube by slipping through socket.

Install the candle follower onto the candle tube.

Install the lamp by screwing it into the socket. Refer to the label on the lamp socket for Max Wattage information.

Install and secure the string of beads by hooking them to the top and bottom of the fixture.

Install the fixture bottom to the fixture base by placing the fixture base through the fixture bottom and screwing the bottom nipple to the fixture
base, then tighten the finial at the bottom.

Install the fixture top to the fixture base by screwing the top nipple to the fixture loop and stem, then screw the stem and spacer to the middle
nipple.

Install the fixture to the chain by opening the bottom chain link and securing it to the fixture loop by closing the link.

4

5

6

7

8

Advertising