Feiss F2755 User Manual

Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE

OR CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts

before

assembly. Bulbs not included.

1. Install the top assembly into the top

coupler.

2. Follow enclosed supplement installation

instructions for electrical and fixture

installation onto house outlet box. If you

do not have an outlet box at desired

location to attach the fixture then hire a

qualified electrician to create one.

3. A. Install the candle tube onto the fitter.

B. Install light bulb (not included). See

relamping label at socket area for type

and maximum allowed wattage.

4. Install the bottom center pipe onto the

bottom coupler.

5. Install bottom assembly onto the bottom

center pipe and secure with the finial.

6. Hang all crystal glass parts as shown on

drawing.

NOTE: To replace broken crystal or pin,

extras are included in hardware bag.

Replace by gently bending open pin,

remove broken crystal or pin, hook new

one, then close back pin. Avoid bending

pin into sharp angle.

Assembly Instructions For

4

5

6

6

2

1

F2755/3

(E) 5/2012

3A

3B

A

B

EXTRA

2

REQUIRED

X 15

X 15

2

A

B

EXTRA

PIN QTY

PIN

PART

4

4

Advertising