Feiss F2303 User Manual

Assembly instructions for

Advertising
background image

(E) 9/07

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR

CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly.

Bulb not included.

1. Spread open arms so they are evenly spread to each

other. Then lock upper section of arms with cap screw

onto corresponding holes at center body.

2. Screw bottom threaded pipe into coupler. Slide

notched cap over bottom threaded pipe and lock arms

into its notches. Lock notched cap into position by

fastening finial onto bottom threaded pipe.

3. Carefully thread fixture wire and ground wire through

fixture loop. Screw fixture loop onto center body until

secure.

4. Spread open lower tier arms so they are evenly spaced

to each other. Then install the arms onto middle tier

arms by fastening with ball cap nuts.

5. Follow enclosed “Chain Suspended Fixture Installation

Instructions” for electrical and fixture installation onto

ceiling outlet box.

6. Install large finial onto bottom section of lower tier

arm.

7. Place candle tubes over candelabra sockets and screw

bulbs (not included) into sockets to secure. See

relamping label on candle tube or type and maximum

allowed wattage.

8. Hang all crystal glass parts as shown on drawing.

NOTE: To replace broken crystals extras are included

in hardware bag. Replace by gently bending open pins,

remove broken crystal, hook new one, then close back

pins. Avoid bending pins into sharp angle.

Bulb

(not included)

Cap Screw

Assembly Instructions For

Socket

Coupler

Notched

Cap

Finial

Bottom Tier Arm

Candle

Tube

Fixture Wires

8 pcs.

40 pcs.

1 pc.

1 pc.

Arm

Fixture Loop

Large Finial

Ball Cap Nut

Center Body

F2303/8

3

2

3

4

1

4

2

2

2

2

1

2

Advertising