Feiss F2690-6 User Manual

Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR CIRCUIT

BREAKER BOX BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly. Bulbs not included.

1. Install stems:

A. Choose desired installation height. Thread fixture wires through each

stems to be used. Note correct position of stems from left diagram. Screw

all stem together until secure.

B. Pass fixtures wires located above the assembled stems through a swivel.

NOTE: Correct position of swivel from left diagram. Install swivel by

screwing onto top end of stem. Install another swivel onto opposite stem

assembly.

C. Pass fixture wires located above swivel and pass through a hole in

canopy. Lock them together by fastening with a lock washer and hex nut

from above. Repeat other side.

2. Install mounting plate:

A. Test install the mounting plate onto ceiling outlet box by fastening with

two screws supplied with the outlet box.

B. Mark with pencil the two holes on mounting plate.

C. Remove mounting plate.

D. IF SHEET ROCK CEILIGNG: Drill marked holes using 3/8" drill bit.

IF MARKED HOLES FALL DIRECTLY BELOW WOODEN CEILING

BEANS: Drill marked holes using 1/8" drill bit.

IF CONCRETE CEILING: Drill marked holes using 3/16" drill bit (for

masonry or concrete type).

NOTE: If in doubt what type of ceiling then consult a qualified contractor

or electrician for installation.

E. Before fastening the mounting plate, pass supply wires and ground wire

from ceiling outlet box through center hole in mounting plate.

F. IF SHEET ROCK CEILING: Insert long machine screws into holes in

mounting plate. Attach butterfly anchors by screwing onto protruding

screws as shown on diagram. Pinch together the ends of butterfly anchors

and push into drilled holes until anchors spring open inside of ceiling. While

gently pulling mounting plate away from ceiling, tighten screws with a screw

driver.

IF MARKED HOLES FALL DIRECTLY BELOW WOODEN CEILING

BEANS: Insert sheet metal screws through holes in mounting plate. Fasten

screws directly into drilled holes.

IF CONCRETE CEILING: Insert plastic anchors into drilled holes. Insert

sheet metal screws through holes in mounting plate. Fasten screws into

plastic anchors.

3. Connect electrical wires:

A. Cut any excess fixture wires and ground wire leaving only about 8" (20

cm) length from top of canopy. Then split fixture wires (with plastic

insulation) and strip off 3/4" (19 mm) of plastic insulation from each end.

B. Connect fixture wires (with plastic insulation):

Connect fixture wires with tracer (square and ridged) to white wire from

outlet box. Connect fixture wires without tracer (round & smooth) to

black wire from outlet box.

NOTE: Black outlet box wire may be red, round and smooth and/or have

copper conductor. White outlet box wire may be square and ridged and/or

have a silver conductor.

C. Connect ground wire:

Connect fixture ground wire to supply ground wire (usually with green

insulation) with wire connector. Note: If there is no supply ground wire at

outlet box then attach fixture ground wire securely onto green grounding

screw located at mounting plate.

IMPORTANT: Never connect ground wire to black or white supply wires

(from outlet box).

4. Install canopy:

While carefully tucking all electrical wires inside of canopy, install the

canopy onto the mounting plate by fastening with two cap nuts.

5. Install the glass panels onto the fixture with the thumb screws and washers

as shown.

6. Install shade by fastening with spacer tube and counter ring.

7. Install light bulb (not included). See relamping label at socket area for type

and maximum allowed wattage.

Assembly Instructions For

F2690/6

(E) 5/11

2D

2A 2B 2C 2E

2F

3A 3B 3C

1C

1B

1A

4

6

7

5

17"

23 "

29 "

35 "

59 "

52 "

47 "

41 "

Advertising