Feiss P1221 User Manual

P1221, Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN

FUSE OR CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly. Bulbs not included.

1. STEM HUNG INSTALLATION:

A. Choose desired installation height. Thread

fixture wires through each stems to be used.

Note correct position of stems from left

diagram. Screw all stem together until secure.

Screw bottom stem into fixture stem until

secure.

B. Thread fixture wires from top stem through

canopy. Install top end of stem assembly by

screwing into canopy.

WITHOUT STEM INSTALLATION:

A. Thread fixture wires from top of fixtuere

stem through canopy. Then screw canopy on top

of fixture stem.

2. Cut excess wires leaving only 6" (15 cm) length

of wires above canopy. Split fixture wire into

two strands. Then strip off 3/4"(19 mm) of outer

plastic insulation.

3. Follow enclosed supplement installation

instructions for electrical and fixture installation

onto house outlet box. If you do not have an

outlet box at desired location to attach the

fixture then hire a qualified electrician to create

one.

4. Install shade by fastening with counter ring.

5. Install light bulb (not included). See relamping

label at socket area for type and maximum

allowed wattage.

Assembly Instructions For

P1221

(E) 12/10

5

4

1

3

2

Advertising