Feiss P1117 User Manual

P1117, Assembly instructions for

Advertising
background image

(E) 10/07

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR CIRCUIT

BREAKER BOX BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly. Bulb not included.

1. STEM HUNG INSTALLATION:

A. Choose desired installation height from dimensions shown in above

diagram. Thread fixture wire through each stem to be used. Please note

correct position of stems from left diagram. Screw all stems together until

secure. Then screw bottom end of stem assembly onto fitter.

FLUSH MOUNT INSTALLATION:

A. Remove stem attached above fitter. Make certain to keep threaded pipe

protruding above fitter.

B. Thread fixture wires, which are located above fitter, through swivel.

C. Screw fitter into swivel.

2. Measure 6" of wire from end of canopy and cut off remaining wire. Split

wires and strip off 3/4" of insulation from each end.

3. Follow enclosed “Multiple Standard Installation Instructions” for electrical

and fixture installation onto ceiling outlet box.

4. Place shade over threaded socket then spacer tube and secure with

counter ring.

5. Install light bulb (not included). See relamping label at socket area for type

and maximum allowed wattage.

Assembly Instructions For

P1117

Ball Cap Nut

Mounting Plate

Mounting Screw

Fixture plate

(canopy)

Stems

(3) 12 in. long

(1) 6 in. long

Socket

Fitter

Shade

Bulb

(not included)

Swivel

9"

45"

39"

51"

21"

27"

33"

15"

Spacer Tube

Counter Rng

Advertising