Feiss OL7513 User Manual

Ol7513, Assembly instructions for

Advertising
background image

IMPORTANT

TURN OFF THE POWER AT THE MAIN FUSE OR

CIRCUIT BREAKER BOX

BEFORE STARTING INSTALLATION

Carefully unpack and identify all parts before

assembly. Bulb

not included.

1. Gently pull supply wires out from ceiling outlet box.

2. Attach mounting strap securely to ceiling outlet box with

two machine screws (supplied with outlet box) through slot

at each end of mounting strap. Note: mounting strap should

be installed with "GND" imprint and/or two dimples facing

down.

3. Fasten one hex nut about 3/4" (19 mm) down from one end

of threaded pipe. Then screw same end of threaded pipe into

center hole in mounting strap. At this point test install the

main frame onto ceiling through this threaded pipe and make

certain 3/8" (10 mm) of pipe protrude below. If not, then

adjust the threaded pipe location by screwing up or down

accordingly. Once correct threaded pipe location has been

adjusted, remove main frame and tighten hex nut against

mounting strap. Make certain not to spin threaded pipe

during tightening.

4. Spread the electrical wires so that the black wires are on one

side of the outlet box and the white wires are on the other

side.

5. Electrical connections:

Connect the white wire from the fixture to the white wire of

the outlet box.

Connect the black wire from the fixture to the black wire of

the outlet box.

NOTE: Black outlet box wire may be red, round & smooth

and/or have copper conductor. White outlet box wire may be

square & ridged and/or have a silver conductor.

6. Grounding Connection:

Connect fixture ground wire (without insulation) to ground

wire from outlet box (usually with green insulation) with

wire connector (not provided).

Note: If there is no supply ground wire at outlet box then

attach fixture ground wire securely onto green grounding

screw located at mounting strap.

IMPORTANT: Never connect ground wire to black or white

supply wires (from outlet box).

7. Place main frame through top threaded pipe so that it sits

flush against ceiling. Be sure all wires are tucked inside.

Secure main frame to ceiling by fastening lock washer and

coupler onto top threaded pipe.

Note: Coupler must turn at least 3 times, if it does not you

must remove coupler and lengthen threaded pipe accordingly.

8. Install long threaded pipe by screwing into bottom of coupler.

Note correct position of center pipe at illustration.

9. Install bulb (not included). See relamping label located at

socket area for type and maximum allowed wattage.

10. A. Slip glass shade through long threaded pipe until it checks

inside of main frame. Then slip cover and lock into position

by fastening with hex nut. Do not over tighten.

B. Install finial.

Assembly Instructions For

OL7513

(E) 5/09

3

2

1

4

5

6

9

7

8

10B

10A

Advertising