4 operation, 1 status indication – INFICON SKY CDG160D 1 ... 1000 Torr / mbar User Manual

Page 23

Advertising
background image

tina53e1-c (2011-11)

23

4 Operation

Put the gauge into operation. If you are using an INFICON con-
troller, define the measurement range (

[1, 2, 3]).

A warm-up time of at least 2 hours should be allowed; for precise
pressure measurements a warm-up time of at least 4 hours is
required.

If the gauge is used for fast downstream pressure con-

trol we recommend setting its signal filter to "fast".
The filter can be set via the RS232C interface or the
diagnostic port (

→  [4]).

4.1 Status

Indication

SP

1

SP

2

ST

A

TU

S

SP ZERO

DIAG

I/O

LED LED

status

Meaning

<STATUS> off

no

supply

voltage

lit solid green

measurement mode

blinking

green

short blinks
long blinks


warning, over/underrange
warming up

lit solid red

error

<SP1> lit

green p

setpoint 1

blinking green

waiting for setpoint 1 input

off

p > setpoint 1

<SP2>

lit solid green

p

setpoint 2

blinking green

waiting for setpoint 2 input

off

p > setpoint 2