7 final works, 1 preparing the commissioning procedure, Final works – Lenze E94ASHE Axis Single Drive 32-104A User Manual
Page 87: Preparing the commissioning procedure, 7final works
Advertising

Final works
Preparing the commissioning procedure
7
l
87
EDK94SH104 DE/EN/FR/ES/IT 5.1
7
Final works
7.1
Preparing the commissioning procedure
You need the following for commissioning:
ƒ
Keypad EZAEBK0001
or
ƒ
Computer with Windows® operating system (XP or 2000)
ƒ
Lenze PC software »Engineer«
ƒ
Connection with the controller via an interface, e.g.
– Diagnostic interface X6 with USB diagnostic adapter
– System bus (CANopen)
– Communication module
ƒ
Software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Mains voltage or 24−V voltage supply for the control electronics of the controller
Follow the instructions of the software and/or read the documentation.
Advertising