7 commissioning, Before switching on, Commissioning – Lenze E82ZAFCC010 User Manual
Page 52: 7commissioning
Advertising
![background image](/manuals/565933/52/background.png)
7
Commissioning
Before switching on
EDK82ZAFCC-010 DE/EN/FR 5.0
52
H1inbet-bevor
7
Commissioning
Before switching on
Stop!
Please check the following before you switch on the controller together with
the function module connected to the CAN system bus network:
ƒ
Completeness of the wiring, earth fault and short circuit.
ƒ
Whether the bus system is terminated at the physically first and last node
through the bus terminating resistor.
Advertising