4 electrical installation, Wiring according to emc, Electrical installation – Lenze E82ZAFAC010 User Manual
Page 31
Advertising
![background image](/manuals/565966/31/background.png)
Electrical installation
Wiring according to EMC
4
EDK82ZAFAC−010 DE/EN/FR 5.0
31
l
H1_E_INST−steckerleiste
4
Electrical installation
Wiring according to EMC
Please observe the following for wiring according to EMC guidelines:
)
Note!
ƒ
Separate control cables from motor cables.
ƒ
Lead the shields as far as possible to the terminals (unshielded core length
< 40 mm).
ƒ
Connect control and data cable shields as follows:
– Analog signal cable shields must be connected with one end at the
inverter.
– Digital signal cable shields must be connected with both ends.
ƒ
More information about wiring according to EMC guidelines can be
obtained from the corresponding documentation for the standard device.
Advertising