3 mechanical installation, 1 attaching operating unit, Mechanical installation – Lenze EPM−H310 User Manual
Page 49: Attaching operating unit, 3mechanical installation, Insert operating unit, With seal, Into the mounting cut−out, Insert mounting clamps, Into the slots at the operating unit
Advertising
![background image](/manuals/566083/49/background.png)
Mechanical installation
Attaching operating unit
3
l
49
EDBPM−H310 DE/EN/FR 7.1
3
Mechanical installation
3.1
Attaching operating unit
The dimensions for the mounting cutout can be found in the "Technical data"
(
¶ 48)
How to mount the operating unit:
0
1
h310_006
1. Insert operating unit
0
with seal
1
into the mounting cut−out.
0 V
DC
N.C
.
LCD
ADJ
+24
VDC
INPUT
: 1
8 -
32
V
5W
FUSE
315
mA
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
2
1
3
4
2
2
h310_011
2. Insert mounting clamps
2
into the slots at the operating unit.
Advertising