2 project transfer to the operating unit, 1 connecting operating unit and pc, Project transfer to the operating unit – Lenze EPM−H310 User Manual
Page 55: Connecting operating unit and pc, Commissioning, Stop
Advertising
Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
l
55
EDBPM−H310 DE/EN/FR 7.1
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
(
Stop!
Only connect PC and operating unit when the units are switched
off!
l
HMI Designer
LCD ADJ
+24 VDC
INPUT: 18 - 32 V 5W
FUSE
315 mA
0 VDC
N.C.
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
1 2 3
4 5
2
3
4
0
1
2
h310_005
Fig. 5−1
Connecting operating unit and PC
1. Plug the programming adapter EPZ−H111
0
onto the ASP8 interface.
2. Connect download cable EPZ−H110
1
to programming adapter
EPZ−H111
0
.
3. Plug download cable EPZ−H110
1
onto COM1 or COMx
2
at PC.
Advertising