2 project transfer to the operating unit, 1 connecting operating unit and pc, Project transfer to the operating unit – Lenze EPM−H310 User Manual

Page 55: Connecting operating unit and pc, Commissioning, Stop

Advertising
background image

Commissioning

Project transfer to the operating unit

Connecting operating unit and PC

5

l

55

EDBPM−H310 DE/EN/FR 7.1

5.2

Project transfer to the operating unit

5.2.1

Connecting operating unit and PC

(

Stop!

Only connect PC and operating unit when the units are switched
off!

l

HMI Designer

LCD ADJ

+24 VDC

INPUT: 18 - 32 V 5W
FUSE

315 mA

0 VDC
N.C.

ASP8

N.C.

CAN+

Shield

CAN-

V-

1

1 2 3

4 5

2
3
4

0

1

2

h310_005

Fig. 5−1

Connecting operating unit and PC

1. Plug the programming adapter EPZ−H111

0

onto the ASP8 interface.

2. Connect download cable EPZ−H110

1

to programming adapter

EPZ−H111

0

.

3. Plug download cable EPZ−H110

1

onto COM1 or COMx

2

at PC.

Advertising