Commissioning – Lenze EVS9332xP User Manual
Page 165
Advertising

Commissioning
Switch−on sequence
Commissioning steps
6.3
6.3.2
l
6.3−3
EDSVS9332P EN 5.0−07/2013
Comment
Switch−on sequence
16.
Enable the controller.
misc009
59
28
X5
}
Terminal X5/28 = HIGH
(see chapter "Commissioning"
®"Controller inhibit")
17.
Start the positioning program via the "Control"
dialog box.
^ 6.14−1
18.
The drive is now running.
)
Note!
In the "Diagnostics" menu, the most important drive parameters
can be monitored.
Advertising
This manual is related to the following products: