3 preparations at the top of the control cabinet, 1 recesses in top of control cabinet (top view), Installation of the e93zwl2 air lock – Lenze E93ZWLX User Manual

Page 43: Preparations at the top of the control cabinet

Advertising
background image

Installation of the E93ZWL2 air lock

Preparations at the top of the control cabinet

15

l

E93ZWLX DE/EN/FR 1.0

4.3

Preparations at the top of the control cabinet

4.3.1

Recesses in top of control cabinet (top view)

0

2

1

3

a

a

a1

b

93ZWL004



Mounting plate



Top of control cabinet



Recess



Position of the controller

a

[mm]

a 1

[mm]

b

[mm]

505

45

200

z

Mark the recesses at the top of the control cabinet and saw them out.

Show/Hide Bookmarks

Advertising