Installation, 318 load unit: unpack upright configuration, Installation 47 – MTS 318 Load Unit User Manual

Page 47: 318 load unit: unpack upright configuration 47

Advertising
background image

318 Load Unit

Installation

47

Installation

318 Load Unit: Unpack Upright Configuration

1. Unpack the load unit.

A. Remove the shipping container (if used).

B. Remove the protective wrapping around the columns.

C. Use a clean cloth to wipe the columns clean.

Note

The load unit can be moved by a fork lift as long as the load unit is
attached to its pallet.

D. Remove the bolts from the wooden beams clamping the load unit to the

pallet.

If you plan on moving the load unit with a fork lift, do not remove the
bolts holding the load unit on the pallet until the load unit has been
moved.

E.

Cut the pallet straps.

Advertising