MTS 318 Load Unit User Manual

Page 76

Advertising
background image

318 Load Unit

76

Routine Maintenance Overview Checklist

Maintenance

Response to Full Stroke Waveform, Visual
and Audible

MTS

MTS

MTS

MTS

Valve Balance check displacement control

MTS

MTS

MTS

MTS

Valve Dither Response

MTS

MTS

MTS

MTS

Grips

Cursory Check of Grips/Grip Control

MTS

MTS

MTS

MTS

Grip Supply Connections are Dry

MTS

MTS

MTS

MTS

Grip Seals are Dry

MTS

MTS

MTS

MTS

Grip Action is Acceptable

MTS

MTS

MTS

MTS

Lubricate Grip Inserts

MTS

MTS

MTS

MTS

*Symbol denotes services performed by equipment operators. Most of these procedures involve visual checks that
should not interfere with test system operation. These checks are also completed by trained field service
engineers on each Routine Maintenance visit.

†Symbol denotes service performed by trained field service engineers as part of an MTS Routine Maintenance
plan. Some of these procedures require special service tools and/or specific service training to complete.

Recommended service to be performed at each running time interval noted

C

ALENDAR

T

IME

USING

8

HOUR

R

UNNING

T

IME

RATE

PER

DAY

D

AILY

W

EEKLY

B

IWEEKLY

A

NNUALLY

R

UNNING

T

IME

-H

OURS

8

40

80

500

1000

1,500 2,000

Advertising