Handling the integrated operations platform, Unloading, Moving the integrated operations platform – MTS Criterion Series 60 User Manual
Page 31: Handling the integrated operations platform 31, Unloading 31, Moving the integrated operations platform 31
Advertising
Handling the Integrated Operations Platform
MTS Criterion™ Series 60
31
Handling the Integrated Operations Platform
Unloading
Choose suitable slings according to the Integrated Operations Platform and crate
weight. Wrap the sling through the crate pallet and raise it.
Moving the Integrated Operations Platform
To move the Integrated Operations Platform to its final location:
1. Unpack the Integrated Operations Platform.
2. Choose suitable chains according to the Integrated Operations Platform’s
weight.
Advertising