Facility Readiness Checklist

Physical space is

ready

Make sure that:

The facility width, length, and ceiling height are adequate to accommodate
the system (Refer to

Space Requirements

and

System Specifications

).

The foundation is prepared correctly (refer to

Foundation Requirements

).

The doors and corridors are large enough to accommodate the system.

Utilities are in place

Make sure that:

Qualified electrical power is available (refer to

Electrical Power

Requirements

and

System Specifications

)

.

Qualified hydraulic oil is available (refer to A1.3 of

the

Installation and

Commissioning Plan)

.

Arrangements have been made to have trades personnel (electrician,
plumber, and so on.) available to make final connections.

The equipment has

been uncrated and

moved into its final

position

The load frame has been uncrated and anchored to the foundation and
leveled according to

Lifting and Moving Instructions.

The Integrated Operations Platform has been uncrated and moved to its final
position and leveled according to

Lifting and Moving Instructions.

The accessories (fixtures, steps, safety enclosure, and so on.) are stored
correctly.

Access to facility

network is available

Make sure the computer network connections are available and IT resources
are available to assign IP addresses and ensure the Internet and Intranet are
accessible.

Customer-supplied

parts are available

Make sure all customer-supplied parts and accessories are available and
ready to connect or install. This can include specimen installation fixtures,
environmental equipment, test area guards, and so on.

Specimens are

prepared

Make sure you have all the needed specimens ready for system tests and
training.

Staff available for

training

Make sure personnel who will manage, operate, and service the equipment
are available during installation for training (refer to

A1.5 of

Installation and

Commissioning Plan)

.