OPERATION

6. Press the generator's pushbutton start switch

(Figure 18) and listen for the engine to start.

Figure 18. Start Switch (GA6HRS Only)

7. If the engine has started, slowly return the choke lever

(Figure 15) to the

OpeN position. If the engine has not

started repeat steps 1 through 6.

8. Before the generator is placed into operation, run the

engine for 3-5 minutes. Check for abnormal smells,

fuel leaks, and noises that would associate with loose

components.

9. Place idle control switch (Figure 19) in the

OFF

position. This will allow the engine speed to run at about

3600 RPM's.

Figure 19. Idle Control Switch (OFF)

ON

OFF

NOTICE

Placing the idle control switch in the

OFF position

(Figure 19) allows the engine to operate at a maximum

speed of about 3600 RPM's.
When the idle control switch (Figure 20) is placed in the

up position (

ON), the generator will run at idle speed

(2200 RPM's) until a load is applied, at that time the

engine speed will increase to 3600 RPM's as long as

a load is being applied.
When the load is not in use, the engine speed will drop

back to the idle mode after about 3 seconds.

Figure 20. Idle Control switch (ON)

10. Place main circuit breaker (Figure 21) in the

ON

position.

Figure 21. Main Circuit Breaker (ON)

11. Place the full power switch (Figure 22) in the 120V

position (up).

Figure 22. Full Power Switch 120V Position (Up)

12. Read voltmeter on front panel of generator (Figure 23)

and verify that 120 VAC is displayed. Using an external

voltmeter as shown in Figure 23, verify that 120 VAC

is present at the 120V twist-lock and GFCI duplex

receptacles.

OFF

ON

OFF

ON

UP

240/120V

NOTICE

When the full power switch is in the 120V position, the

240V twist-lock receptacle cannot be used.