Operation, 120 vac, 120 v – Multiquip GA-6HRS User Manual

Page 26: 240 vac

Advertising
background image

page 26 — ga6HR/ga6HRS 60 hz gENERATOR• OpERATiON ANd pARTs mANuAl — REv. #0 (08/12/14)

OPERATION

Figure 23. 120V Twist-Lock/GFCI Receptacles

13. Place the full power switch (Figure 24) in the 240/120V

position (down).

Figure 24. Full Power Switch 240/120V Position

(Down)

14. Read voltmeter on front panel of generator (Figure 25)

and verify that 240 VAC is displayed. Using an external

voltmeter as shown in Figure 25, verify that 240 VAC is

present at the 120/240V, L14-30R twist-lock receptacle.

120V

OFF

V~

V

300 mV

A

A~

V

COM

120 VAC

GFCI

L5-30R

120

V

G

W

120VAC

X

DOWN

240/120V

Figure 25. 120/240V L14-30R Receptacle

15. Connecting of loads (power tools, lighting etc.) to the

generator receptacles can now be done.

240

V

OFF

V~

V

300 mV

A

A~

V

COM

240 VAC

L14-30R

240VAC

G

Y

X

W

120VAC

G

Y

X

W

120VAC

120VAC

L14-30R

NOTICE

When using a combination of dual receptacles, total

load should not exceed the rated capacity of the

generator.

Advertising
This manual is related to the following products: