Header operation – d series – MacDon M100 SP Operators Manual User Manual

Page 80

Advertising
background image

HEADER OPERATION – D SERIES

169304

78

Rev. C

c. 99Start the engine and activate header down

button on the GSL to fully retract header lift
cylinders.

d. Slowly

drive

windrower

forward so that boots (D)

enter header legs (G). Continue to drive slowly
forward until lift linkages contact support plates
in the header legs, and header nudges forward.

e. Check that linkages are properly engaged in

header legs, contacting support plates.

Connect center link as follows:

MECHANICAL LINK – M150

1. Loosen nut (H) and rotate barrel (J) to adjust

length so that link lines up with header
bracket.

2. Install pin (K) and secure with cotter pin.

3. Adjust link to required length for proper

header angle by rotating barrel (J). Tighten
nut (H) against barrel. A slight tap with a
hammer is sufficient.

4. Proceed to step g.

HYDRAULIC LINK - OPTION

1. Re-locate the pin at the frame linkage as

required to position the hook over the
header pin.

2. Activate header tilt cylinder switches on GSL

to extend or retract center link cylinder so
that the hook lines up with the header
attachment pin.

(continued next page)

K

J

H

D

G

HEADER UP

HEADER TILT UP

HEADER DOWN

HEADER

TILT DOWN

HEADER UP

HEADER TILT UP

HEADER DOWN

HEADER

TILT DOWN

Advertising