MacDon M100 SP Operators Manual User Manual
Page 95
Advertising

HEADER OPERATION – A SERIES
169304
93
Rev. C
h. Disconnect center link as follows:
MECHANICAL LINK – M150
1. Loosen nut (G) and rotate barrel (H) to
relieve load on link.
2. Remove cotter pin on pin (J), and remove
pin to disconnect from header. Re-install pin
in header.
3. Proceed to step i.
HYDRAULIC LINK – OPTION
1. Activate header tilt cylinder switch on GSL to
release load on center link cylinder (K).
2. Lift hook release (L) and lift hook (M) off
header pin.
i. Disconnect header drive hydraulics (N) and
electrical harness (O). Refer to the Auger
Header Operator’s Manual.
j.
Slowly back windrower away from header.
k. Re-install pins (A) in header boots.
K
L
M
H
G
J
N
O
HEADER TILT UP
HEADER
TILT DOWN
A
Advertising