Unloading & assembly – MacDon 922 User Manual

Page 79

Advertising
background image

Form # 46620

Issue 01/06

77

UNLOADING & ASSEMBLY


INSTALLATION (continued):

4. Install one clamp (E) with

3/8 x 1 inch carriage bolt
and smooth flange lock nut.


5. Install four clamps (F) with

3/8 x ¾ carriage bolt, 13/32
flat washer and smooth
flange lock nut. (Install bolts
with heads down. Install
washer between clamp and
nut.)




6. Tie cylinder hoses to existing lube hoses with

plastic ties (G). At left side, ensure that hose clears
all moving parts.


7. Connect the hose from the roll opener cylinders to

the reel lift circuit on the windrower tractor at (H).





















8. Install electrical harness provided with kit onto tractor

as follows:
NOTE: Installation of this harness prevents an

operator from continuing operation with the

conditioner rolls open, or unknowingly extending

cylinders by inadvertently pressing the roll opener

switch while running the header. The new wiring

causes the rolls to close automatically (if open) when

the header drive is engaged.

• The kit harness relay block mounts onto the front

shield for cylinder control valve at right side of tractor.
If holes are not present in shield, drill holes at
dimensions shown at right. Also see photo next page,
top right.

HOSE CLAMPS

E

F

H

CONNECT TO TRACTOR REEL LIFT

TWO HOLES

9/32” DRILL

ADD HOLES TO SHIELD IF NOT PRESENT

(LOCATION DIMENSIONS IN mm)

FRONT SHIELD –

CYLINDER CONTROL

VALVE

G

LEFT RIGHT

SECURE HOSES WITH PLASTIC TIES

Advertising
This manual is related to the following products:

912