Z2 z3 – Retsch AS 200 jet User Manual

Page 39

Advertising
background image

Operating the machine

39

Z6

Air outlet

Connection for the industrial vacuum cleaner

Z7

Cyclone cover

Removable cover with air outlet

Z8

Cyclone

Separates sample material from air current

Z9

Collecting vessel

Collecting tank for sieved sample material

Fig. 16: Connection of the cyclone

Fig. 17: Steps 1 and 2

1.

Push the pin (Z2) into the upper opening on the outer edge of the housing.

2.

Push the cyclone support (Z3) onto the pin.

Z2

Z3

Advertising