RKI Instruments GX-2003 User Manual

Page 19

Advertising
background image

Control Buttons • 19

Need Calibration — selecting this option shows calibration

information only for the GX-2003 units due for calibration.

NOTE: The calibration interval value, the number of days after a

calibration that a new calibration is due, is saved in the
GX-2003. If the calibration interval is changed in the
GX-2003, the new calibration interval value will not be
known by the software until the GX-2003 is downloaded
using the Complete Download button or the
Instrument Information button.

Calibration Date — selecting this option shows the

calibration information for all the GX-2003 units that are in the
software database. The fields for the Need Calibration and
Calibration Date screens are the same. Figure 9 shows the
Need Calibration Option selected.The fields on the Need
Calibration and Calibration Date screens are described
below:

Figure 9: Last Calibration Information: Need Calibration Option

Advertising