Schwank STR-CANADA User Manual

Page 12

Advertising
background image

SP-MSTR-AC-11A

STR Manual

RD: NOV, 2003

RL: 11

KH

Page 8

FIGURE 9 BOLTING BURNER TO FLANGED TUBE

1 Tube
2 Tube Coupler
3 Swaged section of tube.
4 Point at which the Swaged
tube slides into another section
of tube.
5 Once the two tubes are joined,
place centre of the coupling
over the line of the joint and
tighten.

TABLE 4

MODEL

TURBULATOR

LENGTH

STR 60-30

14’ 0”

STR 60-20

14’ 0”

STR 45-20

5’ 0”

STR 45-10

5’ 0”

NOTE: Where required, the STR Series
Heaters will be supplied with turbulators,
factory installed into the end tube (s) of the
system configuration.

FIGURE 10 COUPLER KIT

1 Eye Hook
2 Fifth Nut (Holding Inner Burner to

Housing) Do not loosen or Remove.

3 Lock Washers x 4
4 Burner Flange Adapter
5 Nuts x 4 {Nuts could be shipped c/w

lock washers as one piece}.

6 Flanged Section of Heating Tube

Align the four burner bolts through
the tube flange, secure tightly with
lock washers and nuts

Note: A Flange Gasket is not re-
quired for this application.

Secure suspension chain to eye hook
in order to stabilize burner.

3

2

1

4

5

1

2

3

4

STR-45 models

STR-60 Models

Advertising