START UP SHEET
INSTALLATION SET-UP

AS PER IOM MANUAL AND LOCAL CODES

CONTRACTOR NAME: ..................................................................................................................

ADDRESS:...........................................................................................................................

...................................................................................................................................

CITY:...............................................................................................................................

PHONE:.............................................................................................................................

CELL: ...............................................................................................................................

JOB SITE....................................................................................................................................

MODEL NUMBER:............................................................................................................

SERIAL NUMBER: ...........................................................................................................

SCHWANK EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
IT IS NOT A PLUG IN APPLIANCE..... IT DOES REQUIRE START-UP AND FIELD ADJUSTMENTS

TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO ALLEVIATE
NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING START-UP NEEDS
TO BE COMPLETED BY THE LICENSED GAS INSTALLER.

IF A CONTRACTOR IS CALLING FOR TECHNICAL SUPPORT,

THE FOLLOWING INFORMATION WILL BE REQUIRED

FROM HIS COMPLETED START-UP SHEET.