Vigo VG06061 User Manual

Page 6

Advertising
background image

INSTALLATION STEPS

A.

INSTALLING THE BOTTOM RAIL

6

MODEL VG06061

PREPARATION STEPS TO FOLLOW BEFORE INSTALLATION

1.

Remove the plastic layer from the base border (if needed). Do NOT remove the plastic layer off the plastic
platform of the base.

2.

Properly apply silicone to the wall and base joints.

3.

Make sure to read corresponding base instructions carefully prior to install on the Vigo Brand Shower Door

System. Failure to do so can cause water leakage and bodily harm.

IMPORTANT

To prevent damage to the finish, you should protect the shower cabin bottom with a cardboard protector

before beginning the installation.
Ensure that there is sufficient structural support behind the shower wall to hold the weight of the shower
door. If there is insufficient support, then reinforce the shower walls with wooden studs prior to shower door
installation. [SEE FIG.3]

1.

Remove the aluminum cover from the front piece of the bottom rail by sliding it out.

2.

Remove top of the corner joint. Slide the bottom corner joint (2 pieces) (#11) onto the bottom rail (3 pieces)
(#9). [SEE FIG.3]

3.

Align the bottom rail and corner joint to the desired position on the shower base. Make sure the A and B

distances are correct (see page 3 for A and B distances). Prior to drilling, dry fit everything making sure
that everything is straight, level and plum. Pre-drill for sinkers and

tap sinkers. Cut excess sinker off with hacksaw or sharp blade. Dip screws in silicone. [SEE
FIG.2A] Screw corner joints and rails down. Silicone tops of screws.
4.

Seal the bottom rail with clear silicone caulk and center its sides to the base.

5.

Clip the aluminum cover to the front piece of the bottom rail making sure the lower side faces the inside of

the shower. [SEE FIG.3A]

6.

Silicone the underneath portion of the corner joint caps and put them on the corner joints. [SEE FIG.3A]

PLEASE NOTE THAT WHEN INSTALLING, THE LARGER OF THE SIDE RAILS IS YOUR HINGE
BASE RAIL. THE LARGER OF THE 2 RAILS GOES WITH GLASS PANEL #4. SEE FIG.1A TO
MATCH CONFIGURATION. (THE DIFFERENCE IS MINIMAL, PLEASE REVIEW PRIOR TO INSTALL)

RIGHT SIDE DOOR OPENING

LEFT SIDE DOOR OPENING

A

A

B

C

B

C

A

B

C

C

FIG.1A

CAUTION

!

GASKETS NEED TO BE IN BETWEEN ALL GLASS AND METAL CONTACT. FAILURE TO DO SO
CAN LEAD TO BREAKAGE AND POTENTIAL BODILY HARM.

A

B

Advertising