Original instructions – Rockwell Automation 445L Floor Mounting Column and Cantilever User Manual User Manual

Page 5

Advertising
background image

Floor Mounting Stand and Cantilever User Manual

3

Original instructions

Step 3: Leveling hardware

Step 4: Install profile covers

Step 5: Leveling the two meter post kit

Three hexagon socket head cap screws are supplied to level the floor plate.
If necessary, premount these screws before attaching the floor plate to the
aluminum post.

Four 300 mm profile covers are supplied with each two meter post to hide
the cables. Install these after the cables are assembled and connected. Use a
rubber mallet to secure these profile covers to the two meter post.

When the floor plate is positioned and loosely secured to the floor, adjust each leveling screw to assure the two meter post is attached to the floor.
Then tighten the floor plate to the floor.

Advertising