Maintenance and lubrication schedule – Braun NL Series User Manual

Page 48

Advertising
background image

Page 46

Maintenance and Lubrication Schedule

Perform all procedures listed in previous section also

Inspect handrail components for wear or damage,
and for proper operation

Inspect microswitches for securement and proper
adjustment.

Make sure lift operates smoothly

Inspect external snap rings:
• Handrail pivot pins (2 per pin)
• Platform slide/rotate pivot pins (2 per pin)
• Platform fold axles (1 per axle)
• Inner roll stop lever bracket pins
(1 per pin)
• Lift-Tite

latch gas (dampening) spring (2 per

spring)

Inspect platform fold axles and bearings for wear
or damage and positive securement

Replace defective parts.

Resecure, replace or adjust as needed. See
Microswitch Adjustment Instructions.

Realign towers and vertical arms. Lubricate or
correct as needed.

Resecure or replace if needed.

Replace defective parts and resecure as needed.
Apply Light Oil.

1500

Cycles

continued

Advertising