Maintenance and lubrication schedule – Braun NL Series User Manual

Page 50

Advertising
background image

Page 48

Maintenance and Lubrication Schedule

Perform all procedures listed in previous section also

Replace if needed.

Tighten or replace if needed.

Replace defective parts and resecure as needed.
Apply Light Grease during reassembly proce-
dures.

Replace if needed.

Tighten, replace or correct as needed

Apply Door-Ease or replace if needed. See Lubri-
cation Diagram.

Resecure or replace if needed.

Resecure, repair or replace if needed.

Inspect parallel arms, bushings and pivot pins for
visible wear or damage

Inspect parallel arm pivot pin mounting bolts (8)

Inspect platform pivot pin, bushings and vertical
arms for wear, damage and positive securement

Inspect upper/lower fold arms, rotating pivot slide
arms, slide support arms and associated pivot pins,
bushings, and bearings for visible wear or damage

Inspect gas springs (cylinders) for wear or damage,
proper operation and positive securement

Inspect rotating pivot slide arm UHMW slide bear-
ings (buttons)

Inspect vertical arm plastic covers

Inspect power cable

4500

Cycles

continued

Advertising