Y-Series Motor Installation Instructions 7
Publication 1398-IN518A-EN-P — January 2001
Building and Installing Cables
Knowledgeable cable routing and careful cable construction
improves system ElectroMagnetic Compatibility (EMC).
To build and install cables, perform the following steps:
1. Keep wire lengths as short as physically possible.
2. Route signal cables (encoder, serial, analog) away from motor
and power wiring.
3. Separate cables by 0.3 m (1 ft) minimum for every 9 m (30 ft) of
parallel run.
4. Ground both ends of the encoder cable shield and twist the signal
wire pairs to prevent electromagnetic interference (EMI) from
other equipment.
ATTENTION
High voltage can be present on the shield of a
power cable, if the shield is not grounded.
Ensure there is a connection to ground for any
power cable shield.
Failure to observe these safety procedures could
result in personal injury or damage to equipment.