Procedure for operating lever replacement – step – Rockwell Automation 1500 Isolation Switch Handle Interlock Mechanism Engagement Replacement User Manual

Page 11

Advertising
background image

Bulletin 1500/1900 Isolation Switch Handle – Interlock Mechanism Replacement

11

1500-IN052C-EN-P – January 2007

Procedure for Operating Lever Replacement – STEP 

Shoulder Pin

Retrofit Operating Lever

Lock Washer

Hex Nut

Flat Washer

Spacer

1) Apply lubricant to inside counter bore surface of the Shoulder Pin Spacer

2) Assemble in this order Spacer, Flat Washer and Lock Washer on the Shoulder Pin

3) Screw the Hex Nut on the Shoulder Pin

4) Torque Hex Nut on Shoulder Pin to 48.0ft/lbs ± 8.0ft/lbs

5) Hold the Retrofit Operating Lever carefully, while doing these operations

Advertising