Procedure for operating lever replacement – step – Rockwell Automation 1500 Isolation Switch Handle Interlock Mechanism Engagement Replacement User Manual
Page 7
Advertising
![background image](/manuals/578919/7/background.png)
Bulletin 1500/1900 Isolation Switch Handle – Interlock Mechanism Replacement
7
1500-IN052C-EN-P – January 2007
Procedure for Operating Lever Replacement – STEP
Flat Washer
Hitch Pin
Clevis Pin
Operating Lever
Handle Lever
1) Take out the Hitch Pin that is clipped on Clevis Pin
2) Remove the Flat Washer
3) Pull out the Clevis Pin that connects Operating Lever with Handle Lever
4) Hold the Operating Lever carefully, while doing these operations
Advertising