5 - testing your module, Testing the slc 500 system, Chapter 5 – Rockwell Automation 1746-XXXX SLC 500 4-Channel Analog I/O Modules User Manual User Manual
Page 55: Testing your module, Testing the slc 500 system -1, Start-up procedures -1, Chapter

1
Publication 1746-UM005B-EN-P - June 2004
Chapter
5
Testing Your Module
The purpose of this chapter is to help you isolate problems in a
systematic and controlled manner before beginning normal system
operation.
If your analog module is installed in the expansion chassis of a fixed
system, test your system using the procedures described in the SLC
500 Fixed Hardware Style Installation & Operation Manual
(publication 1747-6.21) before executing the analog module start up
procedures.
Testing the SLC 500 System
If your analog module is installed in a modular system, test the
modular system using the procedures described in the SLC 500
Modular Hardware Style User Manual (publication 1747-UM011)
before executing the analog module start up procedures.
Start-up Procedures
Once you have tested your SLC 500 system, follow the steps below in
sequence to test your analog module:
1. Inspect the analog module.
2. Disconnect prime movers.
3. Power up the SLC 500 system.
4. Test the analog inputs.
5. Test the analog outputs.
6. Start up the system.