Power-up sequence, Power-up sequence -8 – Rockwell Automation 1747-DTAM-E,D17476.1 Data Table Access Module (DTAM) User Manual
Page 22

2-8
Installation and Power Up
Publication 1747-6.1
Power-Up Sequence
When the module is plugged into a processor or link coupler for the
first time, the following sequence occurs:
1. The Communications LED illuminates solid red.
2. The module performs diagnostic self tests.
3. When the tests are complete, the Communications LED turns
off, and the LCD displays:
If the module fails any of the self diagnostic tests, refer to chapter 9,
Troubleshooting, for a list of error and fault codes.
4. The Communications LED flashes green, and the LCD displays:
5. After a successful power-up, the display shows the ready
prompt. You can now perform any of the following functions:
• Change the Module Setup. Refer to chapter 3, Module Setup
Procedure.
• Initiate communications with a SLC 500 family processor.
Refer to chapter 4, Attaching to a Processor.
• Clear an existing Quick Recall Function. Refer to chapter 6,
Quick Recall Functions.
• Observe and respond to a displayed message. Refer to chapter
8, Message Capability.
Enter Network
Working . . .
RDY>