Installing the kinetix 6000 drive modules, Determining mounting order – Rockwell Automation 2094 Kinetix 6000 Axis Module and Shunt Module Install User Manual

Page 4

Advertising
background image

Publication 2094-IN004D-EN-P — September 2006

4

Kinetix 6000 Axis Module and Shunt Module

Installing the Kinetix 6000
Drive Modules

These procedures assume you have mounted your power rail and
integrated axis module (IAM). Each power rail accommodates one
IAM and up to seven additional modules (either axis or shunt). You
must mount a slot filler in any slot not occupied by another module.

Determining Mounting Order

Module Mounting Order

SHOCK HAZARD

To avoid personal injury due to electrical shock, place a slot
filler module (catalog number 2094-PRF) in any empty slot on
the power rail.

Any power rail connector without a module installed will
disable the Kinetix 6000 system, however control power will
still be present.

IMPORTANT

Mount axis modules according to ampere rating (highest to
lowest) from left to right starting with the highest ampere
rating.

Highest Power Utilization or Amp Rating

Lowest Power Utilization or Amp Rating

Integrated Axis Module

2094-AC09-M02

Axis Module

2094-AM02

Axis Module

2094-AM02

Axis Module

2094-AM02

Axis Module

2094-AM01

Axis Module

2094-AM01

Shunt Module

2094-BSP2

Slot Filler Module

2094-PRF

ATTENTION

To avoid damage to the power rail during installation, do not
remove the protective boots until the module for each slot is
ready for mounting.

Advertising