What you need to do – Rockwell Automation LiquiFlo 1.0 and 1.5 External Bus Resistor Kit (400 Amp) User Manual

Page 2

Advertising
background image

2

Instruction Manual D2-3535

What You Need to Do

To install the external bus resistor kit you need to:

❐ Step 1: Verify that the DC Bus Capacitors are discharged

❐ Step 2: Identify a mounting location for the resistor assembly

❐ Step 3: Drill mounting holes for the resistor assembly, using the

template

❐ Step 4: Mount the resistor assembly

❐ Step 5: Unplug connectors P1 and P2, and route harness

❐ Step 6: Connect the ground wire

❐ Step 7: Connect the harness

❐ Step 8: Verify installation

❐ Step 9: Register installation

Step 1: Verifying the DC Bus
Capacitors are Discharged

!

ATTENTION: DC Bus capacitors retain hazardous voltages
after input power has been disconnected. After disconnecting
input power, wait five (5) minutes for the DC bus capacitors to
discharge and then check the voltage with a voltmeter to ensure
that the DC bus capacitors are discharged before touching any
internal components. Failure to observe this precaution could
result in severe bodily injury or loss of life.

Task

Description
Turn off and lock out input power. Wait five minutes

Verify that there is no voltage at the drive’s input power terminals

Remove front cover

Measure the DC bus potential with a voltmeter while standing on a non-conductive surface
and wearing insulated gloves (1000V)

A

B

C

D

Made in USA

BARCODE

U31

FUSE1

C50

D66

D65

D64

C49

C44

U35

C43

C42

C45

U36

C39

D60

C41

D56

T11

Q6

D49

D50

R37

C35

U21

D52

D51

C36

C31

C32

FUSE2

U29

C40

R42

R40

U30

R38

L2

C37

C38

ASSY

D48

C47

TP4

TP5

TP6

TP3

C46

U37

J8

D63

D61

R43

R41

U32

U33

R39

D57

D58

C34

U22

U23

U16

U17

D59

D62

DS2

U34

C48

DS3

DS4

U24

U27

D54

U18

U26

D45

D53

D47

U19

C30

D46

U28

D55

U25

U20

R15

C27

Q5

R35

T10

U14

DS1

R36

D29

D24

U6

C22

D26

C23

T3

L1

C20

C33

U15

D43

D44

T9

R29

R30

D38

D36

U13

C24

D33

D27

D28

T4

T5

R31

D10

D16

Q4

T1

R19

D12

T2

D11

U1

C13

C7

C5

C4

C1

Q2

Q1

C2

C3

R23

C14

D17

R22

D18

C15

C8

D19

C16

R24

C9

RV5

RV3

D6

D1

RV4

J6

J1

R1

RV1

R2

R3

J2

R4

R14

J3

D42

C29

C25

D35

D34

D31

U8

D30

D32

U9

R28

D20

TP1

TP2

U3

R32

U10

D39

C28

D40

D41

D37

C26

U11

R33

U7

D25

T6

C21

U4

U5

T7

T8

U2

Q3

R20

R21

D13

D14

D2

D3

D7

D8

D9

D4

D5

D15

D21

C10

D22

R25

C17

C18

R26

C11

C12

C6

RV6

RV7

R34

U12

C19

D23

R27

J7

RV8

RV2

R16

R17

R8

R9

R10

R18

J4

R5

R11

R12

R13

R6

J5

R7

1

TP2

TP1

D

Test Points for initial

DC Bus Voltage

Measurement

Pos

(+)

Neg

(-)

Advertising