Rockwell Automation T80015 Application Note Trusted SC300E Migration Process User Manual

Page 2

Advertising
background image

Trusted

TM

AN-T80015

Issue 01 Apr 08

AN-T80015

Page 2 of 16

Issue
Number

Date

Revised by

Technical
Check

Authorised by Modification

1

Apr 08

Andy Holgate Nick Owens

Pete Stock

Initial Issue

Introduction

The aim of this document is to provide a guide to the process of upgrading a Triguard SC300E system
to a Hybrid SC300E / Trusted

TM

system by replacing the SC300E processors (MPPs) with Trusted

TM

8161 Bridge Modules controlled by a Trusted

TM

processor.

Starting with the initial understanding of the existing system hardware configuration and functionality,
through to the hardware upgrade process, logic programming and system test, this document will
provide the integrator with the questions that will need to be answered for a successful upgrade.

It is not intended as a step by step guide, rather information regarding the main issues to be addressed
during the system migration process.

Contents

1.

Upgrade Process...................................................................................................................... 3

1.1.

Scope of supply ..................................................................................................................... 3

1.2.

System layout......................................................................................................................... 3

1.3.

Tags, Discretes, Registers..................................................................................................... 4

1.4.

Application logic ..................................................................................................................... 4

1.5.

Mechanical upgrade............................................................................................................... 5

2.

Case Study – 2 chassis ESD system ....................................................................................... 6

2.1.

Scope of Supply..................................................................................................................... 6

2.2.

System Layout ....................................................................................................................... 6

2.3.

Tags, Discretes, Registers..................................................................................................... 6

2.4.

Application logic ..................................................................................................................... 7

2.5.

Diagnostics .......................................................................................................................... 10

2.6.

Mechanical upgrade............................................................................................................. 11

3.

Reference Documentation...................................................................................................... 13

4.

Sample logic comparisons ..................................................................................................... 14

5.

Migration Process – Flow chart .............................................................................................. 16

Advertising