Step 11. Connect harness wire 51/52 to 2TB. Route behind the circuit breaker bracket.

Step 12. Connect wire 51 to the new breaker on the side labeled “LOAD.”

Step 13. Connect harness wire 51 to the new breaker on the side labeled “LOAD.”

Step 14. Connect jumper wire 52 between power cube terminal L2 and the new breaker on the side labeled

“LOAD.”

Important: 5 HP drives have two power cubes. On 5 HP models, connect jumper wire 52 to terminal L1 on the

lower cube.

Step 15. Connect harness wire 52 to the new breaker on the side labeled “LOAD.”

Step 16. Mount the Double Pole Circuit Breaker so that “OFF” is on the left side. Use the Nomex shield saved

in step 3 and the four mounting screws. The Nomex shield should extend to the left of the breaker.

Step 17. Verify the wiring of the Double Pole Circuit Breaker and ensure that all connectors are securely

fastened.

Step 18. Remount the terminal block and circuit breaker bracket to the drive.

Step 19. Reattach the cover to the drive.

Step 20. Turn circuit breaker on.

Step 21. Apply power. If any malfunction occurs when starting the drive, recheck all wiring.

This completes the installation of the Double Pole Circuit Breaker.