Figure 47, Components of the inlet valve and outlet valve – Metrohm 850 Professional IC Anion MSM-HC MCS Prep 2 User Manual
Page 100

5.5 High pressure pump
■■■■■■■■■■■■■■■■■■■■■■
90
■■■■■■■■
850 Professional IC –Anion – MSM-HC – MCS – Prep 2
1
2
3
5
6
7
8
9
10
9
8
7
10
5
4
6
Figure 47
Components of the inlet valve and outlet valve
1
Inlet valve 6.2824.170
2
Outlet valve 6.2824.160
3
Inlet valve housing
4
Outlet valve housing
5
Sealing ring (black)
6
Sleeve
7
Sapphire sleeve
The shiny side must point to ruby ball.
8
Ruby ball
9
Ceramic holder for ruby ball
10 Seal
The larger opening must point outwards.
4 Clean the components of the valve
Rinse the valve components with ultra pure water and/or acetone
and dry with a lint-free cloth.
5 Reassemble the valve
Reassemble valve components according to figure 47, page 90.
■
Insert the seal with the larger opening faced downwards into the
recess of the tool.
■
Lay the other valve components above another in the correct
sequence (see Figure 47, page 90).