18 initial start-up – Metrohm 940 Professional IC Vario ONE/HPG User Manual

Page 43

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

940 Professional IC Vario ONE/HPG (2.940.1140)

■■■■■■■■

35

Connecting the power supply cable

1 Inserting the power supply cable

Insert the power supply cable into the instrument's power socket.

Connect the power supply cable to the power supply.

2 Switching on the instrument

Switch on the instrument using the power switch.

After being switched on, the LED on the front of the instrument
flashes. The instrument conducts a system test and establishes a con-
nection to the software. Once the system test is complete and the
connection to the software has been established, the LED lights up
continuously.

3.18

Initial start-up

Even before the guard column and separation column are installed, the
entire system has to be completely rinsed with eluent for the first time.

Advertising