Creating inspections creating inspections, Step 6 – Banner PresencePLUS BCR 1.3 Series User Manual

Page 8

Advertising
background image



P/N 118000 rev. D

Banner Engineering Corp.

Minneapolis, MN U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

Software Setup

Use the Main Menu toolbar to navigate the PresencePLUS P4 options. Proceeding from left to

right, the buttons in the Menu toolbar step through the process of creating an inspection file.

Inspection Work Flow

step 6

step 6

Add tools to the inspection. Build the tools from scratch or add tools from

a previous inspection file saved on the PC or the Sensor. To add a Vision

tool, click the Tool button. To remove a tool, click the “X” in the lower left

corner of the screen.

a. Add Location tool(s) to find the target to adjust the following Regions

of Interest (ROI) for transitional and rotational changes.

b. Add Vision or Bar Code tool(s) to inspect the part.
c. Add Measure tool(s) to create distance measurements from points

found.

d. Add Test tool(s) to set the Pass/Fail criteria. (The Vision, Bar Code, and

Measure tools are inputs to the Test tool.)

NOTES:Click Quick Teach to automatically set all the selected

parameters in the Test tool and proceed to the Run screen, or

click Next to proceed to the Teach screen, to teach a sample set

of good products.

To manually set min/max parameters in a Test tool, skip Teach

and go directly to Run.

Set up the Sensor, lens, and lighting, to acquire a reference image.
a. Set up the Sensor lens and lighting.
b. Choose Trigger option Continuous for a live image.
c. Click Auto Exposure to adjust the brightness.
d. Focus the Sensor lens by turning the lens until the Focus Number is

maximized.

NOTE: While still in the Setup screen, verify that the trigger works by

selecting External in the Trigger Options. When in Run mode, the

Sensor uses only the external trigger.

e. When you have the desired image, click Next to proceed to the Tools

screen to acquire the reference image.

Required

Required

1.

.

creating

inspections

creating

inspections

TIPS

Before creating an

inspection file, set

up the electrical

configuration

of the external

trigger. (Click

System button,

select

Trigger tab.)

Advertising